Knowledge integration challenges and critical success factors within construction traditional procurement system
-
DOIhttp://dx.doi.org/10.21511/kpm.02(1).2018.03
-
Article InfoVolume 2 2018, Issue #1, pp. 24-37
- Cited by
- 1301 Views
-
284 Downloads
This work is licensed under a
Creative Commons Attribution 4.0 International License
The purpose of this study is to explore and identify the challenges and Critical Success Factors (CSFs) of Knowledge Integration (KI) in terms of capturing, sharing and transferring knowledge within construction projects based on the Traditional Procurement System (TPS). On the basis of available studies on KI and TPS within the industry investigated, multiple case studies were developed to reach the aforementioned objective, involving two case studies to reflect the building sector within construction industry. Furthermore, an Interpretive Structural Modelling (ISM) approach was used to summarize and identify the relationships between the identified challenges. ‘Culture of Organization, ‘Contractual Boundaries’ and ‘Knowledge Management System’ (policies and strategies of organization) are identified as the main challenges. Having an ‘open environment’ and ‘clear liability of project members for sharing knowledge at different phases of project’ are two of identified CSFs, which will assist project managers to enhance the KI process within construction projects undertaken through the TPS.
- Keywords
-
JEL Classification (Paper profile tab)L20
-
References21
-
Tables7
-
Figures3
-
- Figure 1. ISM-based model of KI challenges in the TPS
- Figure 2. Screenshot showing nodes on CSFs of Knowledge Integration
- Figure 3. KI challenges and its CSFs within the TPS
-
- Table 1. Interviewee’s profile
- Table 2. KM challenges within the TPS
- Table 3. KI challenges within the TPS
- Table 4. Self-Structured Interaction Matrix
- Table 5. Initial reachability matrix
- Table 6. Final reachability matrix
- Table 7. Partitioning of variables
-
- Aziz, N., Gleeson, D., & Kashif, M. (2012). Barriers and enablers of knowledge sharing: a qualitative study of ABB, Bombardier (Bachelor Thesis in Business Administration). Ericsson and Siemens. School of Sustainable Development of Society and Technology.
- Bashouri, J., & Duncan, G. W. (2014). A model for sharing knowledge in architectural firms. Construction Innovation, 14(2), 168-185.
- Carlilo, P. (2004). Managing knowledge: lessons from the oil and gas sector. Construction Management and Economics, 22(6), 631-642.
- Charan, P., Shankar, R., & Baisya, R. K. (2008). Analysis of interactions among the variables of supply chain performance measurement system implementation. Business Process Management Journal, 14(4), 512-529.
- CIOB (2010). CIOB’s Professionalism: An Inclusive Definition of Construction Management. Ascot: The Chartered Institute of Building.
- Farzin, M. R., Kahreh, M. S., Hesan, M., & Khalouei, A. (2014). A survey of critical success factors for strategic knowledge management implementation: applications for service sector. Procedia – Social and Behavioral Sciences, 109, 595-599.
- Forman, M., & Haugbolle, K. (2011). The role of clients/end-users in the innovation of detached houses. ARCOM.
- Haddad, M., & Bozdogan, K. (2009). Knowledge integration in large-scale organizations and networks-conceptual overview and operational definition. Massachusetts Institute of Technology (MIT).
- Hari, S., Egbu, C., & Kumar, B. (2005). A knowledge capture awareness tool: an empirical study on small and medium enterprises in the construction industry. Construction and Architectural Management, 12(6), 533-567.
- Heylighen, A., Marin, W. M., & Cavallin, H. (2007). Building Stories revisited: Unlocking the knowledge capital of architectural practice. Architectural engineering and Design Management, 3(1), 65- 74.
- Kasvi, J. J. J., Vartiainen, M., & Hailikari, M. (2003). Managing knowledge and knowledge competences in projects and project organizations. International Journal of Project Management, 21(8), 571-582.
- Love, P. E. D., Lopez, R., & Edwards, D. J. (2013). Reviewing the past to learn in the future: Making sense of design errors and failures in construction. Structure and Infrastructure Engineering, 9(7), 675-688.
- Masterman, J. W. E. (2002). An introduction to Building Procurement Systems (2nd ed.). London: E & FN Spon.
- Nonaka, I., & Takeuchi, H. (1995). The knowledge-creating company: how Japanese companies create the dynamics of innovation. New York, Oxford University Press.
- Panuwatwanich, K., & Stewart, R. A. (2012). Evaluating innovation diffusion readiness among architectural and engineering design firms: empirical evidence from Australia. Automation in Construction, 27, 50-59.
- Raj, T., & Attri, R. (2011). Identification and modelling of barriers in the implementation of TQM. International Journal of Product Quality Management, 28(2), 153-179.
- Salter, A., & Gann, D. (2003). Sources of ideas for innovation in engineering design. Research Policy, 32, 1309-1324.
- Shokri-Ghasabeh, M., & Chileshe, N. (2014). Knowledge management: Barriers to capturing lessons learned from Australian construction contractors perspective. Construction Innovation, 14(1), 108-134.
- Takhtravanchi, M., & Pathirage, C. (2016). Knowledge management challenges within traditional procurement system. International Journal of Computer, Electrical, Automation, Control and Information Engineering, 10(12), 2452-2460.
- Warfield, J. (1976). Societal Systems: Planning, Policy and Complexity. New York: John Wiley & Sons, Inc.
- Winch, G. M. (2010). Managing Construction Projects. Wiley, Hoboken, NJ.