Investment capacity of the economy during the implementation of projects of public-private partnership

  • Received August 8, 2017;
    Accepted September 7, 2017;
    Published November 2, 2017
  • Author(s)
  • DOI
    http://dx.doi.org/10.21511/imfi.14(3-1).2017.03
  • Article Info
    Volume 14 2017, Issue #3, pp. 189-198
  • TO CITE АНОТАЦІЯ
  • Cited by
    8 articles
  • 1184 Views
  • 477 Downloads

Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License

The article considers the peculiarities of the mechanism of public-private partnership. An important problem of the research is to find an optimal ratio in the investment distribution when the arising positive externalities are maximized. In the critical literature review, the assumption was made that the balance between the market and state methods of regulation allows reaching the sustainable growth from the point of view of the use of resources. This hypothesis is developed in the analysis of the multiplicative effect through the index of GDP investment capacity. The research approach is based upon the study of the regression dependencies: multidimensional optimization is solved by the method of configurations with performing the iteration procedure. The obtained results show that the state contribution into the total investment potential of the projects of public-private partnership is traditionally low. The maximal investment capacity of the economy can be reached when maintaining the structure of investment distribution at the ratio 0.09/0.91 for the public and private sectors, respectively. The practical use of the optimization model allows to introduce the flexible mechanism of coordination of the terms of project financing.

view full abstract hide full abstract
    • Figure 1. Infrastructural PPP projects for 1990–2017
    • Figure 2. Top-10 countries using the PPP mechanism, number of contracts
    • Table 1. Dynamics of changing of GDP investment capacity and a share of state participation in the financing of the EU investment projects
    • Table 2. Statistical basis of modelling
    • Table 3. Iteration procedure of optimization