Toward successful project implementation: Integration between project management processes and project risk management

  • Received January 31, 2022;
    Accepted August 16, 2022;
    Published September 6, 2022
  • Author(s)
  • DOI
    http://dx.doi.org/10.21511/ppm.20(3).2022.21
  • Article Info
    Volume 20 2022, Issue #3, pp. 258-273
  • TO CITE АНОТАЦІЯ
  • Cited by
    3 articles
  • 1757 Views
  • 723 Downloads

Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 International License

This study aims to identify the primary aspects contributing to the project’s successful implementation by considering project risk management as a mediating component. The paper uses the survey methodology to examine the impact of project management processes (project start-up, planning, execution, monitoring and control, and closing the project) on successful project implementation by the arts of project risk management as a mediating variable. The study population consists of project managers employed by the Jordan Engineers Association, Jordan Construction Contractors Association, and King Abdullah Design and Development Bureau in Jordan, with a sample size of 96 project managers. A questionnaire was divided into three categories. The primary data were analyzed using the Partial Least Squares (3.3.3) software. The result shows that the arts of project risk management mediate the impact of project start-up, planning, execution, monitoring and control, closing, and management processes on successful project implementation. The findings recommend that integrated project management processes with project risk management could enhance the chances of successful project implementation for Jordanian project managers.

view full abstract hide full abstract
    • Figure 1. Research model
    • Figure 2. Factor analysis results
    • Figure 3. Bootstrapping results
    • Table 1. Demographic information
    • Table 2. Factor loadings of the model
    • Table 3. Reliability and validity tests
    • Table 4. R-squared value
    • Table 5. Results of discriminant validity by the Fornell-Larcker criterion
    • Table 6. Test results for all hypotheses
    • Formal Analysis
      Mufleh AL Jarrah, Baker Jarah
    • Funding acquisition
      Mufleh AL Jarrah
    • Investigation
      Mufleh AL Jarrah
    • Resources
      Mufleh AL Jarrah, Baker Jarah
    • Validation
      Mufleh AL Jarrah
    • Writing – review & editing
      Mufleh AL Jarrah
    • Data curation
      Baker Jarah, Ikhlas Altarawneh
    • Project administration
      Baker Jarah
    • Supervision
      Baker Jarah
    • Writing – original draft
      Baker Jarah
    • Conceptualization
      Ikhlas Altarawneh
    • Methodology
      Ikhlas Altarawneh
    • Software
      Ikhlas Altarawneh